Uprent trench shoring systems were used during the repair of the collector of the wastewater and Lake Ülemiste overflow collector passing through the base of Kalev Stadium.
Used equipment
- LINEAR OWS 7-A 8 meters long
- LINEAR CHAMBER 5×5 meters
Uprent trench shoring systems were used during the repair of the collector of the wastewater and Lake Ülemiste overflow collector passing through the base of Kalev Stadium.
Used equipment