CONSTRUCTION SITE DEWATERING uprentlv@gmail.com May 17, 2016 0 Comment During the construction of two apartment houses, UPRENT installed piston pumps and wellpoint dewatering system to lower groundwater for both trenches. The lenght of the whole line was over 250 meters Contact us Previous Next