PUMPING STATION INSTALLATION
UPRENT installed wellpoint dewatering system and piston pump for groundwater level lovering to ensure safe and dry working conditions for…
PUMPING STORMWATER
Delivered high capacity pumps ensured efficient stormwater bypass.
HORIZONTAL DRAINAGE
This solution is good alternative for wellpoint dewatering in situations when soil has high clay concentration, or otherwise has low…
WELLPOINT DEWATERING AT MAAKRI BLOCK
In order to build foundation posts, constructor had to keep the trench dry. Although some layers of clay ware present,…
QUARRY DEWATERING
UPRENT performed drainage of limestone quarry to make it plausible to use excavators and other machinery to expand the it,…
TRENCH SHORING SYSTEM INSTALLATION
In order to secure excavation pit from all four sides, UPRENT installed Chamber type shorings, that were installed quick and…
PIPELINE CONSTRUCTION
Wellpoint dewatering during the pipeline construction.
UPRENT HAS MOVED TO NEW ADDRESS: BETOONI 15 / PANEELI 5, TALLINN, 11415
CONSTRUCTION SITE DEWATERING
During the construction of two apartment houses, UPRENT installed piston pumps and wellpoint dewatering system to lower groundwater for both…
OVER-PUMPING
Extra pumps ware delivered to dewatering site due to the low altitude of the site and excessive amounts of rainwater.
DEWATERING GROUND FOR CONCRETE WORKS
Upon customer request and project specifications UPRENT provided a commercial building construction site with BBA PT 90 pump and wellpoint…
START SEASON WITH A NEW RANGE OF RENTAL EQUIPMENT!
UPRENT rental assortment is being complemented with AMMANN first-class ground ramming equipment, HUSQVARNA asphalt / concrete cutters, JCB hydraulic equipment,…













